Testing and Installation

As a world-leading manufacturer of modular, air separation technology, Linde sets the benchmark when it comes to manufacturing standards.

Our modular, prefabricated air separation plants are specifically designed for containerisation, ease of installation and start-up. It’s therefore imperative that all compliance and factory testing is completed prior to shipping.  Prior to dispatch, plants are subject to full inspection, including a Factory Accept­ance Test (FAT) for plants up to a certain frame size. 

Inspection and testing are overseen and controlled by our Quality Management System ISO 2001 so no area of testing or compliance is ever overlooked.

Our plants are manufactured to various international standards including ASME, PED, GOST R, DOSH, China - ISQL and KGS.

Installation

Following testing, our containerised plants are factory-assembled onto modular skids or into containers for ease of installation and commissioning at site.

Once at site, our skilled commissioning teams ensure a smooth start-up and hand-over of the plant to your team. And our support does not stop when your plant goes on stream; our service specialists cover every engineering discipline and will readily answer any requests you may have.

As part of our total support services, we can also provide full support for plant modifications and revamps, maintenance and repair, spare parts, operational support such as troubleshooting, immediate repairs, as well as operator training over the entire lifecycle.

If you require any further information about our plant testing or installation, please don’t hesitate to get in touch.